Orbit Tiger 261/125P05-PA Industrial ESS – 261 kWh
Orbit Tiger 261/125P05-PA industrial ESS: 261 kWh of storage for peak shaving, backup and remote monitoring. Turnkey PV+storage projects by Aden Solar.
- Model
- Tiger 261/125P05-PA
- Storage capacity
- 261 kWh
- Type
- C&I ESS cabinet
- Protection
- Cell, module and cabinet level
- Expansion
- By parallel connection
- Application
- On-grid, off-grid, hybrid (PV+ESS)
The Orbit Tiger 261/125P05-PA is a 261 kWh energy storage system (ESS) for factories, commercial buildings and industrial sites. It provides long-duration load supply, peak shaving and outage backup, and keeps energy costs under control with charge/discharge optimisation, remote monitoring and reporting.
Key features
- 261 kWh for long-duration load supply and peak shaving.
- Fast response to sudden load changes and stable power.
- Charge/discharge optimisation, remote monitoring and reporting.
- Protection at cell, module and cabinet level, with over-current, voltage and temperature management.
- Stable operation in harsh site conditions.
- Parallel expansion to fit the project.
- On-grid, off-grid and hybrid (PV+ESS) applications.
Where it is used
- Peak shaving in factories and production sites
- Backup power for commercial buildings
- Higher self-consumption with solar (PV+ESS)
- Off-grid industrial sites
Installation with Aden Solar
Aden Solar studies your site’s load profile to size the storage capacity and power. We offer a turnkey solution: site survey, engineering, solar integration, installation, commissioning and after-sales support.
Frequently asked questions
What is a commercial and industrial energy storage system (ESS)?
An ESS stores electricity in batteries and returns it when needed, with batteries, power conversion, cooling and management software in one cabinet. Sites install one for backup, peak shaving and using solar energy after sunset.
What is peak shaving?
Peak shaving means drawing on stored energy instead of the grid when a site’s consumption is at its highest. It lowers the instantaneous power demand and the peak-related grid costs.
Can capacity be expanded later?
Yes. Several ESS cabinets can be connected in parallel to increase storage capacity and power as the project requires. Aden Solar plans the expansion path with you at the design stage.