Orbit Tiger 261/250P10-PA Industrial ESS – 261 kWh
Orbit Tiger 261/250P10-PA industrial ESS: 261 kWh with fast response and full control for high-power processes. Turnkey delivery with Aden Solar.
- Model
- Tiger 261/250P10-PA
- Storage capacity
- 261 kWh
- Type
- C&I ESS cabinet
- Protection
- Cell, module and cabinet level
- Expansion
- By parallel connection
- Application
- On-grid, off-grid, hybrid (PV+ESS)
The Orbit Tiger 261/250P10-PA is a 261 kWh energy storage system (ESS) built for industrial processes that draw high power over short periods. It responds fast in peak load management and backup scenarios, and gives full control of the site’s energy with real-time monitoring, load optimisation and remote control.
Key features
- Designed for processes that need high power over short periods.
- Long-duration support for peak management and backup.
- Real-time monitoring, load optimisation, remote control and reporting.
- Protection at cell, module and cabinet level, with over-current, voltage and temperature management.
- Stable operation in harsh site conditions.
- Capacity and power growth with parallel ESS clusters.
- On-grid, off-grid and hybrid (PV+ESS) applications.
Where it is used
- Peak shaving in factories and production sites
- Backup power for commercial buildings
- Higher self-consumption with solar (PV+ESS)
- Off-grid industrial sites
Installation with Aden Solar
Aden Solar studies your site’s load profile to size the storage capacity and power. We offer a turnkey solution: site survey, engineering, solar integration, installation, commissioning and after-sales support.
Frequently asked questions
What is a commercial and industrial energy storage system (ESS)?
An ESS stores electricity in batteries and returns it when needed, with batteries, power conversion, cooling and management software in one cabinet. Sites install one for backup, peak shaving and using solar energy after sunset.
What is peak shaving?
Peak shaving means drawing on stored energy instead of the grid when a site’s consumption is at its highest. It lowers the instantaneous power demand and the peak-related grid costs.
Can capacity be expanded later?
Yes. Several ESS cabinets can be connected in parallel to increase storage capacity and power as the project requires. Aden Solar plans the expansion path with you at the design stage.